01 6월 2011 Avatara Mae Phim Condominium news, Rayong
Building A:
° Kitchen installation almost ready
° A/C installations ongoing
° Rectification works ongoing
° Lift to be tested and certified
° Filling swimming pool
° Rear road work to start
Building B:
° Topping 3rd floor ready
° Columns from 3rd floor started (70% done)
° Formwork for beams 4th floor started
° Stair formworks from ground floor started
대상: Avatara Condominium Mae Phim 2 - 라용